In yichang of hubei, this route is a main road, route design specifications for: roadbed width of 50 meters, of which the lanes 22 meters, 6 meters, the median is set 3 meters on both sides of the separation zone, non-motor vehicle driveways 5 meters, sidewalk 3 meters. Design speed of 50 km/h, route length 2000 meters, the starting point of the pile number K0 + 000.00, the finish pile number for K2 + 000.
This design mainly has carried on the roads of flat, vertical and horizontal combination and design; Vertical and channelized intersection design; Roadbed design; Pavement structure design; The road of rainwater drainage design. In the design to the design of the intersection, pavement structure design and road rainwater drainage design as the key point. Throughout the design process, the municipal road design software, using the hongye hongye municipal pipeline design software and Auto CAD auxiliary design.