I have updated the NSOP results for your reference. So far we have received a total of 8 from IQC feedback abnormal product, in that there was found 6 NSOP exceed the standard, although most have been abandoned before the test, but there are still 1 system which shows are already out of the Netherlands. So I suggest the need to group together to ensure that the NSOP exceed the standard side monitoring products are not flow to the next station before finding a better solution.
翻译:
I have updated the NSOP result for your reference. So far we have received eight from IQC feedback abnormal products, there is found in the six NSOP exceeds bid, although most have been abandoned before the test, but there is a display system is already out of charge. So I suggest before finding a better solution to monitor stand there with group to ensure that products tainted NSOP circulation to the next stage.