求助英文翻译。。。着急!!!

2024-11-14 23:45:36
推荐回答(2个)
回答1:

该计划允许API会标许可申请的空气污染指数API会标在产品上。该API会标计划提供重要的价值,国际石油和天然气行业联系起来的一个组织的质量与表现出来的能力,以满足特定产品规格要求的管理体系认证。该会标使用的产品构成了以认为,在指定的日期,产品是按照产品的生产与购买许可申述,并保证已验证
质量管理体系,并按照一API产品规范。
当与许可协议的API,API规范第一季度,其整体的要求一起使用时,定义为那些自愿组织谁希望获得一个API许可证的要求,提供了一个API产品规格按照API的字母组合产品。
API会标计划发牌后,才进行现场审计,核实,符合持牌
在API规范描述了第一季度的总要求,一个API产品规范的要求。
/用户请报告空气污染指数API的字母组合的产品与客户的所有问题。该API会标方案的有效性可以通过加强客户/用户报告问题时遇到的产品符合API字母组合。一个不合格,可能会报告在https使用的空气污染指数不合格报告系统可用:/
/
ncr.api.org。空气污染指数征求对新产品的信息可以找到符合API规定要求不合格,以及现场故障(或故障),它被评定为任何一方的规格不足或不符合规定要求的空气污染造成的。有关成为API会标许可信息,
请certification@api.org接触空气污染指数,认证程序,1220
L街,西北,华盛顿特区20005,或致电202-962-4791或电邮

回答2:

Yunnan Yangzonghai plant three (2 x 300MW) Extension soil monitoring programme implementation
Yangzonghai plant three (2 x 300MW) Extension in the county Shangchi County town of Kunming City in Yunnan Province, the North Coastal Yangzonghai. Geographic coordinates for the 103 meridian east longitude 01 '40 debts, latitude 24 meridian east 57' 42 debts. Plant factory district bordered lakeside beach, east Shangchi towns, low hills gentle slope to the north, Bush Yangzonghai Lake. 20km away from the county seat site licenses, about 36km from Kunming City. States affected by the electricity generating Limited Yangzonghai commissioned, the company undertook three Yunnan Yangzonghai power plant (2 x 300MW) Extension soil monitoring mission in March 2006 Bulgaria signed water monitoring service contracts, accepted tasks in the company technicians and the entire site data collection analysis, completed the "three Yunnan Yangzonghai plant (2 x 300MW) Extension soil monitoring the implementation of the programme", and will launch the next phase of work on monitoring. Monitoring of a total of 18 sub-1.5 years to complete. After the monitoring of soil and water conservation works Yangzonghai plant three to sum up the results of the monitoring, analysis and the preparation of water monitoring reports to help improve water facilities inspection. Mention